Building Regulations: Key Changes & Suitable Products, Part L

APPROVED DOCUMENTS 2010 – F, J, L

With October 2010 came many changes in the Building Regulations for England and Wales. These changes are aimed at reducing the carbon footprint and paving the way to zero-carbon buildings in the UK. Although this brings many new difficult tasks to designers and builders, it is essential for the preservation of our world. The purpose of this post is to point out the key changes to the regulations, and to provide some manufacturers and products suitable for the new regulations.

Among the changes in October were six new Approved Documents:

  1. AD F 2010 – Ventilation
  2. AD J 2010 – Combustion appliances and fuel storage systems
  3. AD L1A 2010 – Conservation of fuel and power: New Dwellings
  4. AD L1B 2010 – Conservation of fuel and power: Existing Dwellings
  5. AD L2A 2010 – Conservation of fuel and power: New Buildings other than Dwellings
  6. AD L2B 2010 – Conservation of fuel and power: Existing Buildings other than Dwellings

As well as three new compliance guides:

  1. The Domestic Building Services Compliance Guide 2010
  2. The Non-Domestic Building Services Compliance Guide 2010
  3. The Domestic Ventilation Compliance Guide 2010

PART L:

Building Regulations Approved Document L1A

Building Regulations Approved Document L1A

SUMMARY:

The new Approved Document L comes with an overall 25% reduction in carbon emissions from 2006. The new Conservation of Fuel and Power document is the next stage to creating a carbon free UK.

For new dwellings, a 25% carbon emissions cut will be made against the baseline of 2006. The Target Emission Rate (TER) will still be calculated using the Standard Assessment Procedure (SAP) to assess energy use and carbon emissions, however there is an increased requirement for air-pressure testing. The Building Control Body must now see tests from three units or half the instances of that dwelling type. For dwellings that are not pressure tested, a “confidence factor” of 2m3/h/m2 @ 50Pa will be applied. It is recommended that a dwelling that will not be pressure tested be designed for a minimum of 8m3/h/m2 @ 50 Pa to equate to a building of 10m3/h/m2 @ 50 Pa.

Dwelling Emission Rate (DER) calculations will now include all fixed low energy lighting, which can be exchanged with other measures to meet the end criteria. However, there is a new requirement that 75% of all lighting fixtures must have a lighting efficiency of 45 lamp lumens per circuit watt. Also, DER calculations do not automatically assume a secondary heating appliance anymore.

More attention is being paid to thermal bridging now. The builder must use the new Accredited Construction Details to calculate the DER of the building or else face penalty.

Conservatories being built as a part of a new dwelling are no longer exempt from the Approved Document L1A. Swimming pools are now included in Part L as well, with a limiting U-value for heat loss to be obtained.

One of the biggest changes for dwellings though pertains to the party walls. Unfilled and unsealed party walls are now assumed to have a U-value of .5W/m2K. The new notional dwelling used to calculate the TER uses a U-value of zero for unfilled and unsealed party walls. This means that treating party walls will not count towards the 25% cut.

For existing dwellings the most significant changes come into play with higher requirements for replacing or refurbishing various building fabrics. There are new U-value limits for walls and roofs, as well as new window and roof light ratings. There have also been some changes for the renovation of thermal elements. When 50% of the element or 25% of the entire building envelope is renovated, the U-value of the entire element should be improved to the new upgrading retained thermal elements standards.

Guidance for conservatories, porches, and swimming pools has also been amended for existing dwellings. Conservatories and porches connected to dwellings at ground level, less than 30m2, with walls and doors that meet the energy efficiency requirements and do not share the heating system of the dwelling are exempt. As for swimming pools, the basins now must meet a U-value criterion.

Any details pertaining to minimum requirements for dwellings can now be found in the new Domestic Building Services Compliance Guide.

For non-dwelling buildings, the 25% cut in emissions constitutes an aggregate approach. Certain buildings will be expected to cut more emissions than others; this is meant to help owners with building types that are not as feasible as others for meeting the requirements.

Construction and building performance regulations have also been put in force to ensure that construction does not stray far from the design. In accordance with new regulation 20D, it is now required that TER and BER calculation and specifications are turned in to the Building Control Body prior to starting construction, as well as upon completion of the project. This is meant to review and see which specifications and methods were used and to what extent they contributed to cutting emissions. The TER will now be calculated using a 2010 compliant reference building instead of a notional building, as put forth in the new National Calculation Methodology Modelling Guide. Calculations must be done according to the new Accredited Construction Details or face penalty. An increased standard for air pressure testing has also been introduced along with new testing and commissioning requirements.

Stricter limits to solar gain have been set in place to discourage air conditioning during the summer months. These solar gain regulations mean specifications such as low emission glass for windows, double and triple glazed windows and solar shading will need to be utilized to meet the requirements.

Large extensions to existing buildings, over 100m2 or more than 25% of existing floor plan, are still treated as new buildings. As for work on existing buildings, U-values for some elements have changed to increase the thermal mass of the building.

Any details pertaining to minimum requirements for non-dwelling buildings can now be found in the new Non Domestic Building Services Compliance Guide.

Owners should specify plant and equipment that are on the Enhanced Capital Allowances technology list such as boilers, chillers and lighting to gain tax relief for being eco-friendly.

KEY CHANGES:

L1A – NEW DWELLINGS

  • New Domestic Building Services Compliance Guide.
  • DER calculations do not assume a secondary heating appliance anymore.
  • More attention is being paid to thermal bridging.
  • If accredited construction details approach is not used, but an experienced person following the guidance of BR 497, then .02W/mK or 25% whichever is greater will be added to the value to be used in the DER calculation.
  • If unaccredited construction details are used, with no specific quantification of thermal bridge values a Y-value of 0.15 must be used in the DER calculation.
  • Party walls now have a U-value of 0 in the notional dwelling. This means that insulating and sealing party walls will not count towards the 25% emissions cut.
  • Conservatories are not exempt as a part of new construction anymore.
  • All fixed low energy lighting will be taken into account for DER calculations. The new definition for “fixed” now includes standard fittings with low energy lamps (≥45 lamp lumens per circuit watt).
  • The worst allowable area-weighted U-values for the building fabric:

Building Element

2006

2010

Roof

0.25

0.20

Wall

0.35

0.30

Floor

0.25

0.25

Openings (Windows, roof lights, doors, etc.)

2.2

2.00

Party Wall

-

0.20


L1B – EXISTING DWELLINGS

  • Conservatories only exempt if: < 30m2, at ground level, the thermal elements of the dwelling connected to it pass energy efficiency requirements and does share a heating system with the dwelling.

  • Max U-Value Standards for extension or replacement thermal elements (extension U-value / replacement U-value):
Building Element

2006 (ext / rep)

2010 (applies to both)

Wall 0.3 / 0.35 0.28

Pitched roof – insulation at ceiling level

0.16 / 0.16 0.16
Pitched roof – insulation at rafter level 0.2 / 0.2 0.18
Flat roof or roof with integral insulation 0.2 / 0.25 0.18
Floor 0.22 / 0.25 0.22
Swimming pool basin - 0.25


  • When 50% of a thermal element or 25% of the entire building envelope is renovated, then the U-value of the entire element should be improved to the new upgrading retained thermal elements standards.

  • Standard for upgrading retained thermal elements (threshold U-value / improved U-value):


Building Element

2006 (thresh / imp)

2010 (thresh / imp)

Cavity Wall 0.7 / 0.55 0.7 / 0.55
Wall – External or internal insulation 0.7 / .35 0.7 / 0.3
Floor 0.7 / 0.25 0.7 / 0.25
Pitched roof – insulation at ceiling level 0.35 / 0.16 0.35 / 0.16
Pitched roof – insulation at rafter level 0.35 / 0.2 0.35 / 0.18

Flat roof or roof with integral insulation

0.35 / 0.25 .035 / 0.18


L2A – NEW NON-DWELLING BUILDINGS

  • New Non-Domestic Building Services Compliance Guide.
  • Aggregate 25% carbon emissions cut.
  • New reduction of solar gain requirements now includes all buildings regardless of whether they are air conditioned or not.
  • The majority of U-Values for new commercial buildings are not changing (area weighted average / individual element):
Building Element

2006 (avg / ind)

2010 (avg only)

Roof 0.25 / 0.35 0.25
Wall 0.35 / 0.7 0.35
Floor 0.25 / 0.7 0.25
Windows, roof lights, etc. 2.2 / 3.3 2.2
Vehicle access doors 1.5 / 4.0 1.5
High usage entrance doors 6.0 / 6.0 3.5
Roof ventilators 6.0 / 6.0 3.5
Air permeability - 10m3/h m2

 

L2B – EXISTING NON-DWELLING BUILDINGS

  • Same changes implemented as L1B with regards to conservatories, porches and renovating thermal elements.

  • Max U-Value Standards for new or replacement thermal elements (new thermal elements / replacement thermal elements):

Building Element

2006 (new / replacement)

2010 (applies to both)

Wall 0.3 / 0.35 0.28
Pitched roof – insulation at ceiling level 0.16 / 0.16 0.16
Pitched roof – insulation at rafter level 0.2 / 0.2 0.18
Flat roof or roof with integral insulation 0.2 / 0.25 0.18
Floors 0.22 / 0.25 0.22
Swimming pool basin - 0.25

 

  • Standards for upgrading retained thermal elements:

Building Element Threshold 2006 2010
Wall – cavity insulation 0.70 0.35 0.55
Wall – external or internal insulation 0.70 0.35 0.30
Floor 0.70 0.25 0.25
Pitched roof – insulation at ceiling level 0.35 0.16 0.16
Pitched roof – insulation at rafter level 0.35 0.20 0.18
Flat roof or roof with integral insulation 0.35 0.25 0.18

 

SPECIFICATION SOLUTIONS:

New carbon emission rate standards call for new building materials, methods and technologies. A great innovative way to help cut carbon emissions is to include photovoltaic (PV) panels in the building design. With the new Feed-in Tariff (FiT), it is now even more cost effective to implement PV panels in place of traditional building materials. PV panels can be utilised in a variety of ways such as for rainscreen cladding, plant screens or louvres. PV can also provide shading to help with the solar gain requirements and reduce cooling loads, while producing energy at the same time. PV seems to be inevitable in the near future, so it is a worthwhile technology to look into.

Another way of cutting carbon emissions is to limit solar gain by use of solar shading. Solar shading can reduce the cooling loads during the summer, effectively reducing energy costs, as well as other benefits. If you are not yet ready to dabble in PV systems, then solar shading provides a solution to cutting carbon emissions by controlling solar gain.

Rainscreen cladding can also be used to help prevent solar gain, reduce noise and provide an aesthetically pleasing facade in addition to its weatherproofing duties. Coupled with external structural wall insulation a rear ventilated facade system can decrease thermal bridging as well.

New U-value limitations have been introduced to increase the thermal efficiency of new and existing buildings and dwellings. To comply with the thermal and air permeability requirements, consideration should be given to new types of building fabrics that meet and exceed the current requirements.

  • http://www.intelligentenergysolutions.com/ Heat Pumps

    thanks for the helpful post, it was a great resource of information.