Restoring heritage buildings to their former glory

During the refurbishment of a heritage building for modern use, the installation of a new floorcovering can serve to significantly enhance the aesthetics and safety of the floor for people using the building. In order to install a new floor, contractors must first prepare a secure subfloor, which must sometimes be achieved whilst preserving period features and original flooring. F. Ball and Co. Ltd.’s Technical Service Manager, Stephen Boulton, advises on damp and other flooring issues that are common in heritage buildings, as well as how to select the right products to achieve a durable floor finish to deadline.

Whatever the flooring installation, the stages of planning and initial preparation are likely to be the most important in defining the success of the project. Understanding the setting and needs of the existing subfloor, particularly whether original floorcoverings need to be protected in listed buildings, will ensure that the best products are selected to deliver a floor that meets the needs and expected use of the building.

Modern research and development around flooring products means jobs that might once have been costly and time consuming can now be completed quickly and efficiently, and moisture protection systems are now available that can offer maximum protection against damp and excess moisture in subfloors.

Rising damp

Rising damp and subfloor moisture are common sources of damage to floorcoverings in heritage buildings, because integral damp proof courses did not become mandatory for new buildings until 1965. Moisture that is left untreated can cause adhesives to debond, resilient floorcoverings to blister and create other flooring failures that compromise the aesthetic appearance of the finished floor or pose trip hazards. Wooden floorcoverings are particularly susceptible to moisture, and likely to warp if installed over a damp subfloor. The costs of moisture-related floor failure can be so high that it is imperative that contractors take the time to investigate subfloor moisture and manage it appropriately.

Thorough testing for the presence of moisture is recommended when beginning any flooring installation, particularly when it is within an old or heritage building. This can be done using a floor-mounted pre-calibrated digital hygrometer, which will give an accurate measurement of relative humidity (RH) levels in the subfloor. When the RH levels are 75% or above, or 65% when working with wooden floorcoverings, a waterproof surface membrane should be installed, to suppress any excess moisture within the subfloor.

Barriers to moisture

For the most extreme cases of subfloor moisture, new single-coat waterproof membrane systems, effective up to RH levels up to 98% (or for use over underfloor heating systems in areas with RH levels up to 90%), are now available. These solvent-free, two-part epoxy resin systems work by bonding with the subfloor to prevent damp from rising to compromise floorcoverings, and cure in approximately three hours.

Residual construction moisture

For a fast track solution to residual construction moisture, perhaps where a heritage building has been extended, F. Ball recommends the use of new rapid-drying, water-based waterproof surface membrane systems, which can achieve a barrier against residual construction moisture in less then two hours. Effective up to RH levels of 95% and ideal for fast track flooring projects, or when rooms need to be brought back into use as quickly as possible, water-based waterproof surface membranes come in a ready-mixed bottle that can be resealed between jobs, offering increased efficiency and less product wastage for contractors.

 

Water based waterproof surface membrane systems create an impenetrable barrier against residual construction moisture in less than two hours

Preserving period floors

When original floors need to be preserved, as is often the case of flooring such as mosaic tiles or wood floors in listed buildings, a loose lay isolator membrane can be used to create a physical barrier between subfloor moisture and new floorcoverings. This is the ideal solution for protecting original flooring, as the sheet allows a new floor to be adhered to its upper surface whilst protecting the floor beneath. By acting as a base to receive resilient floorcoverings and flooring tiles, loose lay isolator membranes allow durable new floors to be installed and easily removed at a later date, allowing buildings to be returned to their original state.

Smoothing subfloors

Often original subfloors in heritage buildings are not smooth enough to receive new floorcoverings, and will need to be prepared with the use of a smoothing underlayment. Care must be taken to choose a smoothing underlayment that is compatible with the building environment, any waterproof membrane used, and new floorcovering. Wood is commonly found as a subfloor in older buildings. Where new flooring needs to be installed over existing wooden subfloors, a flexible smoothing underlayment that can accommodate the inherent movement of wood should be selected. Fibre-reinforced smoothing underlayments give rapid early strength and fast drying properties, helping contractors to complete flooring jobs to tight deadlines.

Selecting an adhesive

When the subfloor is suitably dry and smooth, an adhesive should be selected that is compatible with the floorcovering and the intended use of the floor. General purpose adhesives might seem to offer the easiest option, but contractors should always check manufacturers’ recommended adhesive guides to select the most appropriate adhesive. Due to the wide range of floorcovering types now available, specialist adhesives have been developed to meet the individual requirements of different floorcoverings and settings. Using the correct adhesive will optimise the longevity and appearance of a finished floor, guaranteeing the best results for the people using the building.

Flooring contractors working in heritage settings are expected to deliver lasting, high quality floor finishes, without compromising original period features or aesthetics of the buildings being refurbished. Recent developments in flooring technology mean that rising damp in heritage buildings can now be managed more quickly than ever before, allowing contractors to provide the very best finishes in record time.


Stephen Boulton

Stephen Boulton is the Technical Service Manager for F. Ball and Co. Ltd., the UK’s leading manufacturer of floor preparation products and flooring adhesives. He and his team provide expert technical advice to flooring contractors and specifiers regarding subfloor preparation and selection of the most appropriate flooring adhesives to ensure correct installation of new floorcoverings.